NDIC File No: 19323
Well Type: OG Well Status: A Status Date: 5/20/2011 Wellbore type: Horizontal
Location: NENE 29-150-95
Current Operator: QEP ENERGY COMPANY
Current Well Name: THOMPSON 1-29/32H
Field: GRAIL
Spud Date(s): 1/25/2011
Completion Data
Pool: BAKKEN Spacing: 2SEC
Cumulative Production Data
Pool: BAKKEN Cum Oil: 456217 Cum MCF Gas: 593213 Cum Water: 102335
Production Test Data
IP Test Date: 8/2/2011 Pool: BAKKEN IP Oil: 2521 IP MCF: 2908 IP Water: 842
Monthly Production DataWell Type: OG Well Status: A Status Date: 5/20/2011 Wellbore type: Horizontal
Location: NENE 29-150-95
Current Operator: QEP ENERGY COMPANY
Current Well Name: THOMPSON 1-29/32H
Field: GRAIL
Spud Date(s): 1/25/2011
Completion Data
Pool: BAKKEN Spacing: 2SEC
Cumulative Production Data
Pool: BAKKEN Cum Oil: 456217 Cum MCF Gas: 593213 Cum Water: 102335
Production Test Data
IP Test Date: 8/2/2011 Pool: BAKKEN IP Oil: 2521 IP MCF: 2908 IP Water: 842
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 1-2014 | 31 | 9137 | 9147 | 4760 | 10858 | 10437 | 0 |
BAKKEN | 12-2013 | 29 | 10769 | 10789 | 5078 | 11574 | 11199 | 0 |
BAKKEN | 11-2013 | 30 | 13618 | 13618 | 6363 | 16484 | 16076 | 0 |
BAKKEN | 10-2013 | 31 | 16372 | 16422 | 14067 | 20531 | 20110 | 0 |
BAKKEN | 9-2013 | 29 | 7190 | 7153 | 5170 | 7555 | 7167 | 0 |
BAKKEN | 8-2013 | 17 | 3736 | 4132 | 542 | 228 | 0 | 0 |
BAKKEN | 7-2013 | 31 | 8721 | 8291 | 1337 | 15329 | 14908 | 0 |
BAKKEN | 6-2013 | 30 | 8840 | 8833 | 1300 | 14604 | 14604 | 0 |
BAKKEN | 5-2013 | 31 | 9438 | 9532 | 1333 | 13943 | 13943 | 0 |
Note the jump in production from September, 2013, to October, 2013. It could be explained any number of reasons.
Now, note this well. The horizontal of this well runs parallel to the above well with typical spacing:
NDIC File No: 24949
Well Type: OG Well Status: A Status Date: 9/26/2013 Wellbore type: Horizontal
Location: LOT1 5-149-95
Current Operator: QEP ENERGY COMPANY
Current Well Name: PATSY 2-29-32BH
Field: GRAIL
Spud Date(s): 3/13/2013
Completion Data
Pool: BAKKEN Perfs: 11129-21124 Comp: 9/26/2013 Status: F Date: 9/26/2013 Spacing: 2SEC
Cumulative Production Data
Pool: BAKKEN Cum Oil: 94356 Cum MCF Gas: 147516 Cum Water: 11868
Production Test Data
IP Test Date: 9/26/2013 Pool: BAKKEN IP Oil: 2274 IP MCF: 3608 IP Water: 730
Monthly Production DataWell Type: OG Well Status: A Status Date: 9/26/2013 Wellbore type: Horizontal
Location: LOT1 5-149-95
Current Operator: QEP ENERGY COMPANY
Current Well Name: PATSY 2-29-32BH
Field: GRAIL
Spud Date(s): 3/13/2013
Completion Data
Pool: BAKKEN Perfs: 11129-21124 Comp: 9/26/2013 Status: F Date: 9/26/2013 Spacing: 2SEC
Cumulative Production Data
Pool: BAKKEN Cum Oil: 94356 Cum MCF Gas: 147516 Cum Water: 11868
Production Test Data
IP Test Date: 9/26/2013 Pool: BAKKEN IP Oil: 2274 IP MCF: 3608 IP Water: 730
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 1-2014 | 26 | 15175 | 15263 | 566 | 25279 | 0 | 24951 |
BAKKEN | 12-2013 | 30 | 20344 | 20259 | 2119 | 31845 | 0 | 31445 |
BAKKEN | 11-2013 | 30 | 20655 | 20743 | 2152 | 31435 | 0 | 31029 |
BAKKEN | 10-2013 | 31 | 29248 | 29037 | 3822 | 44660 | 0 | 44239 |
BAKKEN | 9-2013 | 6 | 8934 | 8741 | 3209 | 14297 | 0 | 14110 |
This second well, whose horizontal parallels the horizontal of the first well (they lie opposite each other, heel-to-toe, and toe-to-heel), was fracked in September, 2013. The bump in production for the first well occurred from September to October, 2013.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.