Friday, April 11, 2014

Two Coal Plants Added To The Nation's Grid Accounted For 50% Of All Solar Added In 2013; Proof That Wind Won't Succeed Without Huge Government Subsidies/Tax Breaks

A picture is worth a thousand words. This graph is priceless:


According to the US government:
Natural gas-fired power plants accounted for just over 50% of new utility-scale generating capacity added in 2013. Solar provided nearly 22%, a jump up from less than 6% in 2012. Coal provided 11% and wind nearly 8%. Almost half of all capacity added in 2013 was located in California. In total, a little over 13,500 megawatts (MW) of new capacity was added in 2013, less than half the capacity added in 2012.
The small print has several story lines. Perhaps the biggest story line:
Two coal plants, both delayed projects that were originally scheduled to be completed in 2011-12, accounted for all of the coal capacity added in 2013. The Sandy Creek Energy Station in Texas is a 937 MW conventional steam coal plant that was badly damaged during testing in 2011 and required major repairs before becoming operational. The Edwardsport plant in Indiana is a 571 MW integrated gasification combined-cycle (IGCC) plant, one of only two of the many proposed IGCC projects that actually advanced into construction as natural gas prices dropped (the Kemper County IGCC project in Mississippi is still under construction).  This story is now tracked here.
Nah, this was bigger:
Wind capacity additions (1,032 MW) dropped sharply in 2013 to less than one-tenth of the capacity added in 2012 (12,885 MW). This was a widely expected result of the rush to complete wind projects in 2012 to qualify for the federal production tax credit.
Nah, this was bigger:
New coal activity in 2013 was onepointfive (1.5) times greater than new wind power -- 150% more.