Updates
April 3, 2022: early production.
September 26, 2021: these wells are now all completed and starting to report production. Includes graphics at the link. And, here.
September 19, 2021: IPs starting to be reported.
Original Post
Enerplus is drilling its "Stringed Instrument" pad sited in Squaw Creek, sited in section 3-149-94, running west to east, into Mandaree oil field.
The pad:
- 37029, drl/NC, Enerplus, Fiddle 149-94-02C-01H-TF, Mandaree, producing, huge well;
- 37028, drl/NC, Enerplus, Mandolin 149-94-02C-01H, Mandaree, producing, nice well;
- 37027, drl/NC, Enerplus, Cello 149-94-02C-01H-TF, Mandaree, producing, nice well;
- 37026, drl/NC, Enerplus, Guitar 149-94-02C-01H, Mandaree, producing, nice well;
- 37025, drl/NC-->loc/NC, Enerplus, Harp 149-94-02C-01H-TF, Mandaree, spud 1/6/20; TD 3/13/20; 83.5 drilling hours; that works out to 7 12-hour-segments; I think 5-12-hour segments is about the minimum in the Bakken; producing, nice well;
- 37024, drl/NC, Enerplus, Ukulele 149-94-02C-01H, Mandaree, producing, nice well;
- 24962, 1,957, Enerpluse, Grassy Knoll 2-11H, Mandaree, t11/15; cum 405K 7/20; jump in production, 6/21; cum 437K 7/21;
- 24963, 1,936, Enerplus, Banjo 149-94-02B-01H TF, Mandaree, t11/15; cum 421K 7/20; perhaps a subtle jump in production, 6/21; cum 434K 7/21;
At the same time, a bit to the east, Enerplus is also drilling its "Precipitation Pad" with a rig on site for #35800.
- 35800, 930, Enerplus, Frost 149-93-07A-12H-TF-LL, Mandaree, t10/20; cum 152K 7/21; typical Bakken decline;
The "Precipitation Pad" and "Storm Pad" wells are being drilled east to west.
Most other wells in this area are being drilled north/south.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.