- 35672, H1,
- 35673,
- 35674, H1,
- 35675, H1,
- 35676,
- 35677, H1,
- 35659, Richmond 9-26HSL 1, runs north; 5120-acre unit; Three Forks B1;
- 35658, Addyson 10-23HSL 1, runs south; 5120-acre unit; Three Forks B1;
- 35657, Boston 4-25HSL, runs south; 5120-acre unit; middle Bakken;
- 35656, Boise 4-24HSL, runs north, 5120-acre unit; middle Bakken;
- 35644, H1,
- 35643,
- 35642, H1
- 35641,
- 35580, H1,
- 35579,
- 35566, H1,
- 35565,
- 35564, H1,
- 35563,
- 34698, H1,
- 34697,
- 34696, H1,
- 34695, H1,
- 34694,
- 34693, H1,
- 34692,
- 34691, H1,
- 34690, H1,
Total permits, so far: 139
- Addyson: 6
- Barney: 7
- Bismarck: 7
- Boise: 9
- Boston: 9
- Charleston: 7
- Gjorven: 11
- Gronfur: 6 (includes Gronfur SWD)
- Helena: 8
- Juneau: 10
- Mildred: 8
- Olympia: 7
- Rennerfeldt: 8
- Richmond: 6
- Rolf: 5
- Sacramento: 9
- Springfield: 6
- Topeka: 9
- 1280-acre units
- middle Bakken, 18 x 6: 108 wells
- Three Forks, H1: 18 x 6: 108 wells
- Three Forks, lower benches: 18 x 8 = 144 wells
- 2560-acre overlapping units:
- middle Bakken: 9 x 2 = 18 wells
- Three Forks, H1: 9 x 2 = 18
- Three Forks, lower benches: 9 x 2 = 18
- 5120-acre units
- middle Bakken: 4 x 2 = 8
- Three Forks, H1: 4 x 2 = 8
- Three Forks, lower benches: 4 x 2 = 8
- Total: 438 wells
- Currently: 139 permits
I wonder what HSL stands for... ?
ReplyDeleteFrom the permit, #35658: a Three Forks B1 well; runs north; and drilling unit is 5120 acres.
DeleteYou may have cracked the code... So, that would be a 4 mile horizontal in a 5120... I have heard of 3 mile horizontals, but not sure if I've heard of 4 miles...
DeleteI'll post a screen shot of the permit of one of the wells in a 5120-acre drilling unit. The wells will be typical long lateral horizontal wells (the typical "two-mile" horizontal -- not three miles, not four miles). But anyone owning minerals in any of the eight sections in this 5120-acre drilling unit will receive royalties from this well.
DeleteIn fact, even if the well was a short lateral - if it was only a mile long but yet it was in a 5120-acre drilling unit, mineral owners in all eight sections would be paid royalties from this well.
But I will post a screen shot of the permit to demonstrate what I'm talking about. It will be later, though, when I have some time.
I have been asking that same question and I came to the conclusion that SL - Section Line. H -Horizontal.
ReplyDeleteYes, I should have said that: "SL" = section line. The"1" = a Three Forks first bench well. Thank you for that.
Delete