Is anyone interested in the Kraken Double Eagle wells that came off confidential list today? There are three Double Eagle wells on the pad; two came off the confidential list today; the third was released earlier.
- 36787, drl/A, Kraken, Double Eagle 33-3-3TFH, Sanish, t--; cum 88K after four months;
- 36786, drl/A, Kraken Double Eagle 33-3 2H, Sanish, t--; cum 146K after four months; 48K month;
Production:
- 36787, drl/A, Kraken, Double Eagle 33-3-3TFH, API: 33-061-04544; Sanish, t--; cum 88K after four months; fracked 11/27/2019 - 12/14/2019; 13.76 million gallons of water; 82% water by mass; friction reducer: 0. 0539;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 5-2020 | 30 | 14697 | 14756 | 29178 | 0 | 0 | 0 |
BAKKEN | 4-2020 | 30 | 19130 | 19158 | 36570 | 17218 | 8012 | 8865 |
BAKKEN | 3-2020 | 31 | 23934 | 24067 | 52225 | 23934 | 2095 | 21467 |
BAKKEN | 2-2020 | 29 | 26405 | 26380 | 64950 | 31536 | 724 | 30435 |
BAKKEN | 1-2020 | 24 | 18402 | 17764 | 49012 | 19783 | 4135 | 15299 |
BAKKEN | 12-2019 | 3 | 55 | 0 | 1015 | 49 | 2 | 3 |
- 36786, drl/A, Kraken Double Eagle 33-3 2H, API: 33-061-04543; Sanish, t--; cum 146K after four months; 48K month; fracked 11/27/2019 - 12/14/2019; 11.53 million gallons of water; 82% water by mass; friction reducer: 0. 0506;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 5-2020 | 31 | 20803 | 20873 | 21755 | 0 | 0 | 0 |
BAKKEN | 4-2020 | 30 | 26231 | 25877 | 26873 | 24920 | 16422 | 8153 |
BAKKEN | 3-2020 | 31 | 38993 | 39291 | 41965 | 38994 | 3924 | 34698 |
BAKKEN | 2-2020 | 29 | 48418 | 48227 | 58895 | 59849 | 1330 | 58142 |
BAKKEN | 1-2020 | 28 | 31889 | 31582 | 48285 | 33998 | 8619 | 24976 |
BAKKEN | 12-2019 | 3 | 253 | 0 | 1055 | 247 | 31 | 172 |
- 36785, drl/A, Kraken, Double Eagle 33-3 1H, 33-061-04542, Sanish, t--; cum 113K 4/20; fracked 11/27/2019 - 12/12/2019; 9.4 million gallons of water; 83.9% water by mass; friction reducer: 0.04685;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 5-2020 | 31 | 14034 | 13817 | 15285 | 0 | 0 | 0 |
BAKKEN | 4-2020 | 30 | 17497 | 17458 | 17887 | 15748 | 12068 | 3335 |
BAKKEN | 3-2020 | 31 | 27160 | 27494 | 28925 | 27160 | 2905 | 23883 |
BAKKEN | 2-2020 | 26 | 29660 | 29536 | 35366 | 36969 | 406 | 36227 |
BAKKEN | 1-2020 | 29 | 24717 | 24498 | 41165 | 25800 | 5757 | 19628 |
BAKKEN | 12-2019 | 3 | 318 | 0 | 688 | 420 | 354 | 22 |
From the file reports.
36786:
- second of three wells to be drilled on this pad (sic)
- spud: 9/17/2019
- TD: 11/1/2019
- total depth: 21,448'
- a toe-up, three-string, double section lateral
- target: middle Bakken
- target zone: 10' thick between 22' and 32" below the top of the middle Bakken;
- big rig: began at 0714 hours, October 17, 2019, at 8,300' MD
- KOP: began at 9,760'; begun at 0712 hours, October 28, 2019
- middle Bakken
- encountered at 10,345'MD; landing depth reached at 1442 hours, October 28, 2019 (wow)
- lateral:
- began at 1952 CT, OCtober 29, 2019
- without incident, drilling continued to TD of 21,448' MD; reached at 1704 hours, November 1, 2019;
- gas shows: 1956 units at 10405' in the middle Bakken
- lateral in the target zone (see above)
- second of three wells to be drilled on this pad (sic)
- spud: 9/18/2019
- TD: 11/12/2019
- total depth: 22,645'
- a toe-up, three-string, double section lateral
- target: Three Forks
- target zone: 10' thick between 20' and 3" below the top of the Three Forks;
- big rig: began 0817 hours, November 5, 2019, at 8,300' MD
- KOP: began at 0245 hours, November 6, 2019
- encountered the Three forks at 10,459' MD at 1241 hours, November 6, 2019
- lateral: began at 2252 hours CT November 7, 2019
- drilling continued to a depth of 15,741' MD reached at 0851 hours CT, November 9, 2019;
- BHA tripped; changes; drilling resumed that day;
- drilling until 19.204' MD, then tripped again;
- finally reached 22,645' MD at 1940 hours on November 12, 2019 (wow)
- TD reached about 1.04' below the top of the target zone (wow)
- gas units as high as 1372 units at 10435' MD in the vertical and the curve, in the lower Bakken;
- gas shows: gas units as high as 1913 unit at 19276' MD
- second of three wells to be drilled on this pad (sic)
- spud: 9/16/2019
- TD: 10/23/2019
- TD: 19,955' MD
- a toe-up, three-string, double section lateral
- target: middle Bakken
- target zone: 10' thick between 20' and 30" below the top of the middle Bakken;
- drilling similar to above
- KOP, building the curve, landing: required two BHAs; 12 hours;
- lateral: look at this, if no typos --
- began 0704 hours, October 21, 2019
- reached TD of 19,955' at 0614 hours on October 23, 2019
- one hour short of two full days!!! -- I'll tag this post with "records"
- gas units: a high of 2491 units at 18157' MD
- geosteering: 10' target located between 22' and 25' (sic) below the top of the middle Bakken