Pages

Saturday, September 25, 2021

The Enerplus "Winter" Pad Updated -- September 25, 2021

This page will not be updated. These wells are tracked elsewhere. 

Several things to note that a lot of analysts don't understand about the Bakken:

  • no rigs factored into this huge jump in production 10/20;
  • likewise, no rigs factored into another huge jump in production 5/21;
  • operators in the Bakken don't report a single well periodically; they often report an entire pad at one time; the drilling costs were sunk costs as much as two years earlier; note: drilling costs don't include fracking costs; total costs = drilling + completion (fracking)
  • in addition, they control when to "open" the pad
  • a lot like growing / storing / selling wheat

The wells:

  • 35800, 930, Enerplus, Frost 149-93-07A-12H-TF-LL, Mandaree, t10/20; cum 152K 7/21;
  • 35801, 1,588, Enerplus, Hail 149-93-07A-12H, Mandaree,  t10/20; cum 183K 7/21;
  • 35802, drl, Enerplus, Sleet 149-93-07A-12H, Mandaree,  t10/20; cum 192K 7/21;
  • 35803, 1,599, Enerplus, Blizzard 149-93-07A-12H, Mandaree,  t10/20; cum 196K 7/21;
  • 25736, 2,347, Enerplus, Snow .... , t6/15; cum 549K 11/19 -- wow! Only 39 stages; 
  • 25735, 1,773, Enerplus, Rain ..., t6/15; cum 374K 11/19; came off line 11/19; remains off line 3/20; back on line 4/21; cum 382K 7/21;
  • 25738, 1,946, Enerplus, Sun ..., t8/14; cum 408K 3/20; was off line 3/19 - 9/19; small jump in production; cum 433K 7/21;
  • 25737, 1,278, Enerplus, Wind ...., t9/14; cum 360K 3/20; was off line 3/19 - 9/19; huge jump in production; see this post; back on line 5/21; cum 365K 7/21;

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.