Pages

Wednesday, May 26, 2021

A Closer Look At EOG's Six New Liberty LR Permits Today -- May 26, 2021

EOG with six new permits, #38326 - #38331, inclusive:

  • Comments: EOG has permits for six Liberty LR permits
    • four of them will be sited in NWSE 23-151-91; two will be sited in NWNE/NENW 26-151-91;
      • the four in section 23 will be sited between 2465' FSL and 2330' FEL and 1025' FSL and 2300' FEL
    • the two (#38330, #38331) in section 26-151-91 will be sited in exactly the same spot, 1200' FNL and 2350' FWL according to the NDIC daily activity report, but that is incorrect according to the scout ticket:
      • 38331, Liberty LR 125-2629H, 1150 FNL 2350 FWL
      • 38330, Liberty LR 66-2629H, 1200 FNL 2350 FWL

    The six new permits:

    • 38326,Liberty LR 59-2320H,
    • 38327,Liberty LR 121-2320H,
    • 38328,Liberty LR 123-2320H,
    • 38329,Liberty LR 62-2329H,
    • 38330,Liberty LR 66-2629H,
    • 38331,Liberty LR 125-2629H,

    Producing wells and permitted sites in these two sections:

    • 19720, 510, EOG, Liberty LR 14-23H, Parshall, t4/11; cum 310K 3/21;
    • 30593, loc, EOG, Liberty LR 29-2321H, Parshall,
    • 30594, loc, EOG, Liberty LR 108-2321H, Parshall,
    • 30595, loc, EOG, Liberty LR 30-2321H, Parshall,
    • 19721, 1,063, EOG, Liberty LR 19-23H, Parshall, t3/11; cum 404K 3/21; F;
    • 18971, 894, EOG, Liberty LR 09-23H, Parshall; 320-acre spacing,  t9/10; cum 258K 3/21;
    • 26601, 1,045, EOG, Liberty LR 27-23H, Parshall, t3/14; cum 222K 3/21;
    • 26602, IA/1,135, EOG, Liberty LR 28-23H, Parshall, t3/14; cum 215K 3/20; offline;
    • 20255, 892, EOG, Liberty LR 15-26H, Parshall, t4/12; cum 389K 3/21; 
    • 20254, 980, EOG, Liberty LR 20-26H, Parshall, t12/11; cum 357K 3/21; huge jump in production, 3/21;
    • 18065, AB/369, EOG, Liberty LR 100-26H, Parshall; 320-acre spacing, t8/10; cum 100K 1/19;

    The graphics:

    5 comments:

    1. It looks like on that last map, that there is one mile out in the lake that is not drilled from either side... ?

      ReplyDelete
      Replies
      1. In this area, Slawson from the west, and EOG from the east, will "cover" all sections under the river/lake.

        In this particular case, the new EOG permits (#38329 - #38331) will site in section 26 and the lateral will extend all the way to section 29, picking up that last half mile or so.

        North of that, the EOG wells (#38326 - #38328) will site in section 23, and the lateral will extend all the way to section 20, picking up that last half mile or so.

        Bottom line, all sections under the river/lake will eventually by tapped.

        Delete
      2. For newbies, "LR" in EOG's Liberty LR wells stands for "long reach." The standard length of laterals in the Bakken is "two miles or two sections." In areas under the river/lake, EOG is drilling "LR" (long range) laterals which will go out 2.5 to 3.5 miles (2.5 sections / 3.5 sections) to capture that oil farthest out.

        Delete
    2. Replies
      1. In this particular area, one-half mile: the oil field boundary runs down the middle of these two sections (#20 and #29) -- thus cutting that section in half and ending the drilling / spacing unit there.

        Delete

    Note: Only a member of this blog may post a comment.