December 27, 2022: initial production for wells on this pad. Monster wells. 

December 27, 2022: the parent well --

  • 19839, 1,311, MRO, Windy Boy USA 12-35H, Antelope, t8/11; cum 406K 10/22;

Original Post

On August 6, 2020, NDIC reported a new MRO permit: the permit --

  • 37776, loc/PNC, Ida USA: 1404' FNL 1795' FEL; SWNE 34-152-94, Antelope-Sanish oil field;

The wells on this pad will be running generally west to east. There are several MRO wells in the area that are running north to south and should not be affected by these new wells. However, I noted tonight that these older MRO wells -- all very good wells -- came off line 11/20. 

A look at the NDIC map revealed that MRO is drilling the wells on the pad where the Ida USA well was permitted (now canceled):

  • 37607, loc/drl-->drl/drl (2/21), MRO, Saint Pierre USA 12-35TFH, Antelope-Sanish,
  • 37608, loc/drl-->drl/drl (2/21), MRO, Robin USA 12-35H, Antelope-Sanish,
  • 37609, ros-->drl/drl (2/21), MRO, Shoberg USA 11-35TFH, Antelope-Sanish,
  • 37610, loc/drl,->drl/drl (2/21), MRO, Black USA 11-35H, Antelope-Sanish,
  • 37776, loc/PNC, MRO, Ida USA 11-35TFH, Antelope-Sanish,
  • 37611, loc/drl-->drl/drl (2/21), MRO, Archer USA 13-35TFH, Antelope-Sanish,
  • 37612, loc/drl-->drl/drl (2/21), MRO, Cavanaugh USA 11-35TFH, Antelope-Sanish, 

These wells are southwest of the Monson pad identified in the graphic at this post, but these wells are not pointed out at that post. 