Pages

Wednesday, July 1, 2020

Initial Production Data For Two Oasis Joplin Wells Coming Off Confidential List Today -- July 1, 2020

The wells:
  • 35728, SI/A, Oasis, Joplin 5397 41-32 2B, API: 33-053-08826, Banks, t--; cum 176K after four months; 50K month; fracked: 10/10/2019 - 10/21/2019; 14.45 million gallons of water; 92.05% water by mass; friction reducer, 0.03942;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN4-2020304229842300217959278091840864
BAKKEN3-2020315002049990265661092351077811377
BAKKEN2-2020294553445686261891055981040001526
BAKKEN1-20203137855377022255694303916392509
  • 35727, SI/A, Oasis, Joplin 5397 41-32 3T, API: 33-053-08825, Banks, t--; cum 121K after four months; fracked: 10/10/2019 - 10/21/2019; 11.9 million gallons of water; 94.5% water by mass; friction reducer, 0.04299;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN4-2020302756427570213289125690331850
BAKKEN3-2020313712137098302321115181100351405
BAKKEN2-20202931046311492988875167740101084
BAKKEN1-20203125615255194166678083758512077

From the file reports.

35728, Oasis, Joplin 5397 41-32 2B:
  • 17 miles northeast of Watford City; 
  • second of two wells on this pad
  • target: middle Bakken
  • big rig: re-entered May 17, 2019
  • vertical drilled to 10,580'
  • KOP landed at 11,432', approx 12' below the base of the lower Bakken shale
  • formations:
    • upper Bakken shale (Mississipppian): entered at 11,102' TVD
    • middle Bakken (Mississippian-Devonian): entered at 11,019' TVD (sic)
  • target zone was 18' thick zone, beginning 11' below the base of the upper Bakken shale and extending to 11' above the lower Bakken shale;
  • lateral was drilled with three separate BHAs, reaching TD of 22,560' MD on May 28th, 2019
  • lateral drilled in five days; exposed 11,148' of uncased hole, entirely within the middle Bakken
  • background gas throughout the later: 300. - 3,500 units; averaging around 2,000 units
  • 5 - 12' trip flare noted;
35727, Oasis, Joplin 5397 41-32 3T:
  • first of two wells on this pad
  • target: Three Forks, 1st bench
  • big rig: re-entered on April 29, 2019
  • vertical hole drilled to depth of 5,971' (sic) 
  • the 819' curve (from KOP to curve total depth) was drilled in 11.25 hours using a single BHA
  • curve was successfully landed at 11,489' MD, approximately 32' below the Pronghorn
  • the lateral was drilled using two separate BHAs
  • reached TD of 22,465' on May 12, 2019
  • formations:
    • upper Bakken shale (Mississipppian): entered at 11,101' TVD
    • middle Bakken (Mississippian-Devonian): entered at 11,020 TVD (sic)
    • lower Bakken (Devonian): entered at 11,064' TVD
    • Pronghorn (Devonian): entered at 11,090' TVD; light to medium brown oil staining; looks to be about four feet thick;
    • Three Forks, 1st bench (Devonian): entered at 11,094' TVD; tan to light brown dolomire and light blue to pale gray shale; the shale was soft to friable, earthy in texture, and contained variable amounts of disseminated pyrite; visible intercrystalline porosity and light brown spotty oil staining;
  • target: a 20' thick zone, beginning 12' below the base of the Pronghorn and extending to 8' above the claystone
  • background gas throughout the lateral ranged from 250 - 3,000 units, averaging around 1,600 units;
    • gas connections ranged from 200 units to over 6,100 units; a 5 - 12' trip flare observed
  • the lateral portion was drilled in a total of four days; exposed 10,996' of uncased hole; entirely within the Devonian Three Forks 1st bench
So, again, the drilling times in the Bakken, the goal/standard, big rig:
  • completing the vertical in one to two days (24 to 36 hours)
  • completing the curve in twelve hours, up to 18 hours
  • completing a two-section lateral in as little as four days, generally less than six day, with exceptions

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.