Pages

Saturday, November 25, 2023

Update On An MRO Re-Fracked Well In The Bailey Oil Field -- November 25, 2023

Locator: 46167B.

From October 20, 2019

The well:

  • 16654, 311, MRO, Buehner 34-12H, Bailey, t8/07; cum 192K 6/19; had declined to 1,000 bbls/month; cum 478K 5/22; huge jump in production, 11/19; cum 516K 9/23;
  • Sundry form, August 1, 2019:
    • MRO is planning to sidetrack and refrack this well. Originally an open hole completion in 2007 ... an original TD of 19,917 feet MD ... MRO plans to .... extend the lateral ... plans a 40-stage plug and perf style completion, completing the well with three additional infill wells from the same pad are drilled and completed. These wells are scheduled to be drilled in August and completed in October, 2018.

Production period of interest:

BAKKEN5-20203013319132981234920483174682062
BAKKEN4-20203017302174021705826682201475326
BAKKEN3-20203125299252452563029121193078094
BAKKEN2-20202927971279182970228620026754
BAKKEN1-20202724594246902963124984410019202
BAKKEN12-20193143129432715423439080595824698
BAKKEN11-2019720602201072571516561014152
BAKKEN10-20190000000
BAKKEN9-20190000000
BAKKEN8-20190000000
BAKKEN7-201900800000
BAKKEN6-201928153615487531285690418
BAKKEN5-2019932323142129884160
BAKKEN4-20190000000
BAKKEN3-20190000000
BAKKEN2-20190000000
BAKKEN1-201900180000
BAKKEN12-2018123063697831117991
BAKKEN11-20183084382731979849653
BAKKEN10-201831924914223846324421
BAKKEN9-201830944940161800504198
BAKKEN8-20183188789626289674556

 Let's see what the other three wells on this pad are doing:

  • 36737, drl-->AL/A, MRO, Kloster 44-12H, first production, 11/19; t--; cum 406K 5/22; cum 465K 9/23;
  • 36736, drl-->AL/A, MRO, Emil 24-12TFH, first production, 12/19; t--; cum 252K 5/22; cum 284K 9/23;
  • 36735, drl-->AL/A, MRO, Bitter 34-12TFH, first production, 10/19; t--; cum 335K 5/22; cum 383K 9/23;

No comments: