Pages

Friday, September 15, 2023

Updating The MRO Pelton Well In Bailey Oil Field -- September 15, 2023

Locator: 45669B.

The well:

  • 17255, MRO, Pelton 24-31H, Bailey. 17255, original well drilled in 2008, thirteen years ago; and re-fracked in 2017:
    • 465, MRO, Pelton 24-31H, t9/08; 
    •  1,799, MRO, Pelton-24-31H, t4/17; cum 562K 10/21; cum 647K 7/23;
    •  the well has produced 647,253 bbls of crude oil since it was first drilled; 
    •  before the re-frack the well had produced 179,311 bbls of crude oil (over a period of 103 months);
    •  after the re-frack the well produced 382,279 bbls of crude oil (over a period of 55 months)
    •  after the well was re-fracked, it produced about twice as much oil in half the time that it produced prior to the re-frack.

Recent production, since 12/21:

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN7-20232633223287322441743154596
BAKKEN6-2023141352141714971920164491
BAKKEN5-20233139333811352655844922160
BAKKEN4-20233037923848322545563791283
BAKKEN3-20233143564497417758565010306
BAKKEN2-20232745614600418752894189603
BAKKEN1-202331620461826423703749061457
BAKKEN12-20221627312649292331572602247
BAKKEN11-20223057015669647864005039728
BAKKEN10-202231652464897930734355231105
BAKKEN9-202230688569329127716064180
BAKKEN8-2022318184820014123878279240
BAKKEN7-20223195959638231379847878991
BAKKEN6-20223090778932301797658666468
BAKKEN5-202225542452902668846023325697
BAKKEN4-20220000000
BAKKEN3-20220000000
BAKKEN2-20222200000
BAKKEN1-2022001360000
BAKKEN12-2021728819720523013144
BAKKEN11-2021303732374426382978244965
BAKKEN10-2021314892499538634167357038

    No comments:

    Post a Comment

    Note: Only a member of this blog may post a comment.