Pages

Sunday, September 10, 2023

The Dallas Arch: Northaven Trail Bridge Over US75 -- Just Completed -- September 10, 2023

Locator: 45604TX.

Link here for the project.

Map above:

  • north side of downtown Dallas
  • the red line: the new connector over the highway, connecting multiple local trails
  • oval: parking area and entrance to the Northaven Trail on the west side of US 75

I'm looking to bike this new trail connector this week. It's due east of us, about 30 minutes. Might just be one of the most interesting trail connectors in America. We'll see.

US 75 / US 77: Dallas to Oklahoma City.

US 75: Dallas to Tulsa. 

For some, US 75 might be as historic as US 66, and unlike US 66 which is pretty much "history," US 75 is as busy as ever. 

YouTube visualization: https://www.youtube.com/watch?v=jXxQN9ZpxPc (2018).

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.