Pages

Friday, February 24, 2023

An Oasis Camp Oil Field With Jump In Production -- February 24, 2023

The well:

  • 21640, 3,163, Oasis, Catch Federal 5201 11-12H, Camp, t2/12 cum 355K 12/22; file report, stimulated 1/12/12; 37 (31?) stages; 82,999 bbls of water; 4.5 million bls proppant (sand and ceramic); total drilling time: 11 days:
    • vertical hole to a depth of 10,300 on December 9, 2011; 85.5 hours; December 9, 2011;
    • the curve, from kickoff point at 10,346 to 11,140 MD; 26.5 hours
    • the lateral section drilled from 11,140 to 200,450 (TD); 9,3100 feet drilled in 155 hours; TD reached 04:11 hours (CST) on December 22, 2011
      • the lateral section, two miles down, targeted a 10-foot seam of the middle Bakken, situated 6 feet to 19 feet below the upper shale of the Bakken formation

Recent production: 

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN12-20223090448960823813591192165
BAKKEN11-20222032463178246752023524686
BAKKEN10-202200120000
BAKKEN9-20220000000
BAKKEN8-20221317621719134430529
BAKKEN7-20223155762449613931046316
BAKKEN6-20223080273368319571294622
BAKKEN5-20223163064550014321144259

Initial production:

BAKKEN8-201231826386715258134013400
BAKKEN7-20123110754107284881624962490
BAKKEN6-201222845585804593551555150
BAKKEN5-2012241043996277632464346430
BAKKEN4-201213512558622689255825580
BAKKEN3-20123120804202821249011339113390
BAKKEN2-20122726047257062358524635271621919

 

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.