Pages

Sunday, March 27, 2022

Murex' Borstad Wells In West Tioga -- March 27, 2022

Updates

March 30, 2022:  from a reader; the reader's thoughts and my thoughts --

  • Patterson 280 rigging is coming down today
  • all wells drilled to depth
  • the rig was a walking rig
    • back and forth, the rig drilled the four wells to KOP
    • once KOP reached in all four wells, rig walked back to complete the laterals
  • some of this is fact; some conjectural; explains everything

Original Post

From a reader:

If you want to solve a real head scratcher figure out why Patterson 280 has been on the Murex Borstad 3 well pad all winter. I may be wrong but the way the rig is oriented on location leads me to believe they could still be on the first hole.

I drive past it at least 2x per day and there is little activity and there's always pipe in the derrick like they're tripping.

I'll come back to this one later. I don't have any news, but I need to spend some time on it. Later, some data:

The wells:

  • 38598, conf, Murex, Sheldon Mark 34-22H-A 3MB, Tioga, no production data,
  • 38599, conf, Murex, Borstad 34-10H-A 2MB, West Tioga,
  • 38600, conf, Murex, Sheldon Mark 34-22H-A 2MB, Tioga,
  • #38601, conf, Murex, Borstad 34-10H-1 1MB, West Tioga, no production data,

Patterson 280:

  • November 30, 2021: --
  • December 20, 2021: 38598, Murex, Sheldon Mark 34-22H-1-3MB -- first day;
  • December 27, 2021: 38601, Murex, Borstad 34-10H-A 1MB
  • December 30, 2022: 38600, Murex, Sheldon Mark 34-22H-A 2MB,
  • January 18, 2022: 38600, Murex, Sheldon Mark 22-10H-A-2MB,
  • February 28, 2022: 38599, Murex, Borstad 34-10H-A-2MB,
  • March 25, 2022: 38601, Murex, Borstad 34-10H-A-1MB,
  • --, 38598, Murex, Sheldon Mark 34-22H-A 3MB, Tioga

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.