Pages

Wednesday, December 1, 2021

Hess With Four New Permits; Three DUCs Reported As Completed -- December 1, 2021

The definitive rig count report will be provided later. The NDIC is reporting 34 active rigs (which I doubt). T&S Drilling 1, for example, is shown drilling two different sites for two different companies. And one site is not even an oil and gas site.

Active rigs:

$66.58
12/1/202112/01/202012/01/201912/01/201812/01/2017
Active Rigs3114576654

Four new permits, #38683 - #38686, inclusive:

  • Operator: Hess
  • Field: Wheelock (Williams)
  • Comments:
    • Hess has permits for four GO-Ron Viall permits in Wheelock oil field; the four wells will be sited in SWSE 25-156-98; 
    • the wells will be sited between 702 FSL and 778 FSL and 1929 FEL and 1993 FEL;

Three producing wells (DUCs) reported as completed:

  • 37218, 1,474, Slawson, Zephyr Federal 4-36H, Big Bend, first production, 9/21; t--; cum --;
  • 37426, 2,222, Slawson, Orca Federal 2-23-36H, Big Bend, no production data,
  • 37500, 1,682, Harrisburg 7-34HSL, Indian Hill, no production data,

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.