Pages

Saturday, July 17, 2021

A CLR Radermecher Second Bench Three Forks Well Goes Over 500K Bbls Crude Oil -- July 17, 2021

After some of these wells were taken off line last summer, all CLR Radermecher wells are now back on line. The Radermecher wells are tracked here.

The well:

  • 28998, 1,880, CLR, Radermecher 4-22H2, Camel Butte, t2/17; cum 502K 11/20; off line 5/20; back on line 8/20; cum 509K 5/21; stimulated 11/16; 39 stages; 10.9 million lbs proppant;

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.