Pages

Friday, March 5, 2021

Zavanna Stranger Wells in Poe Oil Field -- Update -- March 5, 2021

This page will not be updated. These wells are tracked here.

Four producing wells (DUCs) reported as completed, all wells are updated:

  • 35665, SI/A, Zavanna, Stranger 28-21 1TFH, Poe, first production, 12/19; t--; cum 132K 1/21;
  • 35666, SI/A, Zavanna, Stranger 28-21 2H, Poe, first production, 1/20; t--; cum 188K 1/21;
  • 35667, SI/A, Zavanna, Stranger 28-21 3TFH, Poe, first production, 12/19; t--; cum 136K 1/21;
  • 35668, SI/A, Zavanna, Stranger 28-21 4H, Poe, first production, 12/19; t--; cum 228K 1/21;
  • 35669, SI/NC, Zavanna, Stranger 28-21 5TFH, Poe, first production, 12/19; t--; cum 163K 1/21;
  • 35670, SI/NC, Zavanna, Stranger 28-21 6H, Poe, first production, 11/19, t--; cum 227K 1/21;
  • 35671, SI/NC, Zavanna, Stranger 28-21 7TFHXE, Poe, first production, 11/19; t--, cum 138K 1/21;

4 comments:

  1. As per CLR to complete a well in the Bakken is about 6 million bucks. At today's crude price, about 300, barrels to pay for the well.

    ReplyDelete
    Replies
    1. And some operators are frequently reporting upwards of 300K bbls in less than two years.

      Delete
    2. 1. With no pumping costs, no taxes, no royalties.

      2. I'm assuming the missing thousands was a typo (OK).

      Delete
    3. Yes, 300K. I saw that, too, but figured most would understand. Thank you for opportunity to note and thank you for taking time to write.

      Delete

Note: Only a member of this blog may post a comment.