The well:
  • 17050, 391, Petro-Hunt, Phelps Mineral Trust 6B-2-1H, Charlson, t3/09; cum 184K 7/19; cum 213K 11/20; original frack back in 2009, 7 stages; less than 750K lbs of sand; a Three Forks well; a 50' flare if you can imagine that! Total horizontal section was 5,291' with 5,291' (100%) in the pay zone.

Update: back in late 2019, the operator noted a problem with this well; planned to re-enter/seek to repair. 

Graphics at this link.

Some observations:

  • this well is a single section well; spaced at 640 acres
  • it is a very, very old well by Bakken standards, drilled back in early 2009 -- over ten years ago
  • it is in a very, very good field, amenable to nice jumps in production with neighboring fracks
  • the Charlson may just be the best field in the Bakken
  • so, why was this well taken off line? Let's look at the map

See this note;

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN11-20203040173837206056754819647
BAKKEN10-20203145534811253544013838347
BAKKEN9-202030514950753225684966400
BAKKEN8-2020316760724237431003198150
BAKKEN7-20203958078946816109
BAKKEN6-20200000000
BAKKEN5-20200000000
BAKKEN4-20202832503823172752574844230
BAKKEN3-202021419137364316569755860
BAKKEN2-20200000000
BAKKEN1-20200000000
BAKKEN12-20190000000
BAKKEN11-20190000000
BAKKEN10-20190000000
BAKKEN9-20190000000
BAKKEN8-20190000000
BAKKEN7-2019154456761358567590
BAKKEN6-201930902695157151513060
BAKKEN5-20193178987421016161259141
BAKKEN4-2019309659002931929163486