Pages

Sunday, January 24, 2021

Closer Look At A Huge Hess EN-Labor Well In Alkali Creek -- January 24, 2021

The wells:

  • 37066, conf, Hess, EN-Labar-154-94-1003H-9, 33-061-04618, Alkali Creek, fracked 5/28/20 - 6/5/20; 6.5 million gallons of water; 83.8% water by mass;
DateOil RunsMCF Sold
11-20202548736968
10-20202645641469
9-20203001744685
8-20204138434128
    From the file report:
    • spud date: March 1, 2020
    • cease drilling: March 8, 2020
    • target: middle Bakken
    • logging services began at a depth of 8,110' MD at the base of the Tyler formation at 8:00 a.m., March 3, 2020;
    • the KOP was reached at 10:15 p.m., March 3, 2020 (14 hours)
    • the curve:
      • began: March 4, 2020, at 9:00 a.m. CT
      • build curve reached TD of 10,947' at 5:30 p.m. CT, March 4, 2020 (8 hours)
    • lateral:
      • began: 4:15 a.m. CT on March 6, 2020
      • center of the ideal target area was located 30' vertical depth inside the middle Bakken formation;
    • the overall drilling window has a thickness of 20' inside the middle Bakken formation with the base ending at 40' total vertical feet
    • the entire lateral was drilled within the target geological area except 270' that was drilled within one foot of the base target location;
    • two collision points deconflicted:
      • EN-Labar 154-94-0310H-1
      • EN-Labar 154-94-0310H-3
      • location for the intersection of the lateral wells are estimated at 8,304' VS for the H-1 and 11,409' VS for the H-3;
    • total depth reached at 8:10 p.m. CT on March 8, 2020 (60 hours -- 2.5 days -- wow;
    • 14 + 8 + 60 = 7.5 days from start to finish;
    • gas levels averaged 388 units with a maximum of 4,024 units
    • drill rates averaged 339.90 feet/hour but rounding, about 350 feet/hour, about half-a-mile an hour. Incredible.

    No comments:

    Post a Comment

    Note: Only a member of this blog may post a comment.