Pages

Wednesday, September 30, 2020

No New Permits; WTI Up About A Dollar After Weekly EIA Report; Jobs Report; Consumer Confidence -- September 30, 2020

 Active rigs:

$40.22
9/30/202009/30/201909/30/201809/30/201709/30/2016
Active Rigs1158675833

No new permits.

Nine permits renewed:

  • Bruin E&P (6): six FB Clinton permits renewed in Dunn County;
  • QEP (3): two MHA permits in Dunn County renewed, and a Cymbaluk Federal permit in Stark County renewed.

Two producing wells (DUCs) reported as completed:

  • 31968, SI/A, Petro-Hunt, Klevmoen Trust 153-95-17D-7-4H, Charlson, no production data,
  • 37309, drl/A, WPX, Omaha Woman 24-13-12HIL, Squaw Creek, t--; cum --;
From the file report, #31968, Petro-Hunt, Klevmoen:
  • parallels #34611; see this note; halo effect; jump in production;
  • spud: April 18, 2019;
  • cease drilling: May 16, 2019
  • extended long lateral;
  • target: Three Forks
  • spacing unit: 1920 acre
  • logging began within the Charles at 8,300 feet on April 26, 2019, at 12:00 p.m. CT
  • KOP reached at 9,810 feet on April 28, 2019, 1:45 a.m.
  • lateral began at 11:43 p.m.CT, May 4, 2019
  • TD reached at 23,486' on May 16, 2019 at 7:00 p.m. CT
  • if no typos, a long time to drill this lateral;
  • fracked 7/10/2020 - 7/30/20; 17.242 million gallons of water; 91.86% water by mass

From the file report, #37309, WPX, Omaha Woman:

  • drilling unit: 3840 acres; extended long lateral; 
  • middle Bakken; facies C, D, and E
  • spud February 5, 2020; curve operations began February 10, 2020; concluded on February 11, 2020; lateral operation began on April 2, 2020, and concluded on April 5, 2020
  • T: 26,883'
  • 10' thick target; about 15' below the top of the middle Bakken formation, making the seam about 40' thick; typical for the middle Bakken;
  • fracked 8/1/20 - 8/22/20; 8.94 million gallons of water; 84.69% water by mass;

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.