A Closer Look At The Two Most Recent CLR Wells Reporting From The Brooklyn Oil Field -- July 2, 2020

The two CLR Brooklyn wells that came off confidential list today:
  • 35644, SI/A, CLR, Boise 5-24H1, API: 33-105-05028; Brooklyn, t--; cum 40K in 47 days; extrapolates to 25K over 30 days; fracked 11/21/2019 - 11/28/2019; 5.8 million gallons of water; 87.4% water by mass;
  • 35643, SI/A, CLR, Boise 6-24H, API: 33-105-05027; Brooklyn, t--; cum 53K in 54 days; extrapolates to 29K over 30 days; fracked 11/21/2019 - 11/28/2019; 8.5 million gallons of water; 86/6% water by mass;
Production:
  • 35644:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-202000940000
BAKKEN4-2020201698517065271773542334451943
BAKKEN3-20202722463222893939944222415052680
BAKKEN2-20200000000
BAKKEN1-2020219119102300
BAKKEN12-201920025766820666
  • 35643:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-2020001240000
BAKKEN4-20202522389225022947348872475351301
BAKKEN3-20202930621303844049057296537833473
BAKKEN2-20200000000
BAKKEN1-2020114214201100
BAKKEN12-201920021617010685

From the file reports

35644:
  • a north lateral;
  • target: Three Forks
  • objective: to steer the well within the 12' target zone located 14' below the Three Forks top
  • spud: 4/19/19
  • TD: 4/29/19
  • TD: 21,668' MD
  • big rig: started on 4/21/2019
  • formation tops:
    • upper Bakken: 11138'
    • middle Bakken: 11157'
    • lower Bakken: 11207'
    • Three Forks: 11233'
  • the "clean portion" of the target zone (located above the Internal 1 shale) ranged from 6 to 9 feet thick
  • very low gas, less than 500 throughout except one reading of 740; averaged 300;
  • start drilling vertical section, 2303', 0800 hrs 4/19/19
  • reached KOP at 10792'; 2337 ours; 4/21/19; TOOH for 18 hours or so while drilling the vertical
  • start curve at 10792'; start drilling at 0800, 4/2219; land curve at 11539'; 0725 hours, 4/23/19; TOOH for seven hours or so;
  • lateral:
    • lateral: begun at 0237 hours, 4/25/19
    • TD lateral: 21,668' 1953 hours, 4/29/19
  • 91% within the target zone
  • drilled from surface casing to TD in 11 days
35643:
  • a south lateral
  • target: middle Bakken
  • objective: to steer the well within the 20' target zone located 12' below the middle Bakken top;
  • spud: 4/3/19
  • TD: 5/419
  • TDP 21,612' MD
  • low gas units
  • vertical: about a day and a half; once, TOOH
  • KOP/curve: curve took about 12 hours
  • lateral: drilled in 2.5 days