Is anyone interested in the Kraken Double Eagle wells that came off confidential list today? There are three Double Eagle wells on the pad; two came off the confidential list today; the third was released earlier.
  • 36787, drl/A, Kraken, Double Eagle 33-3-3TFH, Sanish, t--; cum 88K after four months;
  • 36786, drl/A, Kraken Double Eagle 33-3 2H, Sanish, t--; cum 146K after four months; 48K month;
First, where are they? See this post. This is where these wells will be tracked.

Production:
  • 36787, drl/A, Kraken, Double Eagle 33-3-3TFH, API: 33-061-04544; Sanish, t--; cum 88K after four months; fracked 11/27/2019 - 12/14/2019; 13.76 million gallons of water; 82% water by mass; friction reducer: 0. 0539;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-202030146971475629178000
BAKKEN4-2020301913019158365701721880128865
BAKKEN3-20203123934240675222523934209521467
BAKKEN2-2020292640526380649503153672430435
BAKKEN1-20202418402177644901219783413515299
BAKKEN12-2019355010154923
  • 36786, drl/A, Kraken Double Eagle 33-3 2H, API: 33-061-04543; Sanish, t--; cum 146K after four months; 48K month; fracked 11/27/2019 - 12/14/2019; 11.53 million gallons of water; 82% water by mass; friction reducer: 0. 0506;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-202031208032087321755000
BAKKEN4-20203026231258772687324920164228153
BAKKEN3-20203138993392914196538994392434698
BAKKEN2-20202948418482275889559849133058142
BAKKEN1-20202831889315824828533998861924976
BAKKEN12-201932530105524731172
  • 36785, drl/A, Kraken, Double Eagle 33-3 1H, 33-061-04542, Sanish, t--; cum 113K 4/20; fracked 11/27/2019 - 12/12/2019; 9.4 million gallons of water; 83.9% water by mass; friction reducer: 0.04685;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-202031140341381715285000
BAKKEN4-20203017497174581788715748120683335
BAKKEN3-20203127160274942892527160290523883
BAKKEN2-2020262966029536353663696940636227
BAKKEN1-20202924717244984116525800575719628
BAKKEN12-20193318068842035422

From the file reports.

36786:
  • second of three wells to be drilled on this pad (sic)
  • spud: 9/17/2019
  • TD: 11/1/2019
  • total depth: 21,448'
  • a toe-up, three-string, double section lateral
  • target: middle Bakken
  • target zone: 10' thick between 22' and 32" below the top of the middle Bakken;
  • big rig: began at 0714 hours, October 17, 2019, at 8,300' MD
  • KOP: began at 9,760'; begun at 0712 hours, October 28, 2019
  • middle Bakken
    • encountered at 10,345'MD; landing depth reached at 1442 hours, October 28, 2019 (wow)
  • lateral:
    • began at 1952 CT, OCtober 29, 2019
    • without incident, drilling continued to TD of 21,448' MD; reached at 1704 hours, November 1, 2019;
  • gas shows: 1956 units at 10405' in the middle Bakken
  • lateral in the target zone (see above)
36787:
  • second of three wells to be drilled on this pad (sic)
  • spud: 9/18/2019
  • TD: 11/12/2019
  • total depth: 22,645'
  • a toe-up, three-string, double section lateral
  • target: Three Forks
  • target zone: 10' thick between 20' and 3" below the top of the Three Forks;
  • big rig: began 0817 hours, November 5, 2019, at 8,300' MD
  • KOP: began at 0245 hours, November 6, 2019
    • encountered the Three forks at 10,459' MD at 1241 hours, November 6, 2019
  • lateral: began at 2252 hours CT November 7, 2019
    • drilling continued to a depth of 15,741' MD reached at 0851 hours CT, November 9, 2019;
    • BHA tripped; changes; drilling resumed that day; 
    • drilling until 19.204' MD, then tripped again;
    • finally reached 22,645' MD at 1940 hours on November 12, 2019 (wow)
  • TD reached about 1.04' below the top of the target zone (wow)
  • gas units as high as 1372 units at 10435' MD in the vertical and the curve, in the lower Bakken;
  • gas shows: gas units as high as 1913 unit at 19276' MD
36875:
  • second of three wells to be drilled on this pad (sic)
  • spud: 9/16/2019
  • TD: 10/23/2019
  • TD: 19,955' MD
  • a toe-up, three-string, double section lateral
  • target: middle Bakken
  • target zone: 10' thick between 20' and 30" below the top of the middle Bakken;
  • drilling similar to above
  • KOP, building the curve, landing: required two BHAs; 12 hours;
  • lateral: look at this, if no typos --
    • began 0704 hours, October 21, 2019
    • reached TD of 19,955' at 0614 hours on October 23, 2019
    • one hour short of two full days!!! -- I'll tag this post with "records"
  • gas units: a high of 2491 units at 18157' MD
  • geosteering: 10' target located between 22' and 25' (sic) below the top of the middle Bakken