Pages

Friday, February 21, 2020

A Closer Look At A Petro Harvester Well -- Still A DUC, But Producing -- February 21, 2020

The well:
  • 36690, SI/NC, Petro Harvester, Three Forks, first bench; FTH1 27-34 161-92 B, Foothills, t--; cum 16K first full month of production;  
Production:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN12-201931160061570510213120477020477
BAKKEN11-2019105390221523760376


From the file report:
  • 13 miles north of Powers Lake, Burke County; sits on a pad with intentions of drilling a lateral through the Three Forks, first bench;
  • Patterson 348, a modern top drive rig with walking capabilities; surface to TD in 13 days;
  • vertical to KOP: 48.9 hours
  • KOP to curve TD: 12.8 hours
  • lateral with one assembly: 55.7 hours
  • total lateral footage: 9,906'
  • target window: 12- 20' into the Three Forks first bench;
  • exposed 75.6% of the lateral borehole to the target window;

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.