Random Update Of 2019 Permits -- A WPX Ruby Well In Antelope-Sanish -- October 20, 2019

This well is SI/NC (a DUC) but initial production suggests this will be a huge well. Neighboring wells remain off line.  

The well:
  • 36089, SI/NC, WPX, Ruby 31-30HEL, Antelope-Sanish, fracked 6/6/19 - 6/14/19; 4.7 million gallons of water (a very small frack); 83.8% by mass; sand, 15.3% by mass, t--; cum --; 
Early production:

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
SANISH8-20192630393304791795836836301062674
SANISH7-2019172061721014716424989022185
SANISH6-20192164816560287860186

From the well file:
  • spud, April 11, 2019 (sic -- double checked)
  • surface casing already set; measured depth of 21,094 feet reached April 23, 2019 (sic -- double checked)
  • the entire well bore was drilled within the middle Bakken
  • the curve section was begun on February 21, 2019 (sic -- double checked -- this is probably an error; probably should have been April 13 or thereabouts), and was completed on April 14, 2019 (sic)
  • drilling of the lateral began on April 19, 2019, and completed at 21,094' MD on April 23, 2019; 
  • one can see the error in dates in this screenshot from the file report: