The well:
- 33938, drl, Petro Harvester Operating Company, LLC, PTL2 4-28 164-92 C, target: Madison, Portal oil field, some production reported;
| Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
|---|---|---|---|---|---|---|---|---|
| MADISON | 3-2019 | 20 | 1315 | 635 | 11980 | 3786 | 2786 | 1000 |
| MADISON | 2-2019 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
From the well file:
- permit says the spacing unit is 560 acres (slightly less than the standard section of 640 acres)
- target: Midale/Nesson Porosity; 30' thick seam;
- this grassroots well was spud on November 9 and reached TD of 15,175' MD on November 28, 2108
- approx 2.5 miles southwest of Portal, ND, in the central portion of the Williston Basin
- lateral #1 produced 7,924' of 6" openhole volume after intermediate casing point of 6,619' MD in the 30' foot thick Midale/Nesson Target (92% in Target)
- vertical hole drilled to 1,373 MD'
- KOP in the Triassic Spearfish formation
- the Mississippian lower Midale target top was drilled at 6,490' MD / 5,923' TVD
- TD on November 3, 2018
- TD was projected to be 8,880.04'
- [0.04' = 0.48 inch]
- average background gas, 450 units
- connection gases as high as 3,800 units
- "prepared for an anticipated hydraulic frac job to enhance, then produce, the moderately tight porosity / permeability observed in the Midale/Nesson target