Pages

Thursday, July 5, 2018

Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018

Updates

August 11, 2019: the graphic in the original post has been updated --



The six "new" wells to the east (note that the #32533 horizontal does not show up on the map):
  • 32533, 946, Petro-Hunt, USA 153-95-4B-9-4H, Charlson, t1/19; cum 208K 9/19;
  • 32532, 586, Petro-Hunt, USA 153-95-4B-9-5H, Charlson, t1/19; cum 105K 9/19;
  • 32531, 1,134, Petro-Hunt, USA 153-95-4B-9-6H, Charlson, t1/19; cum 253K 9/19;
  • 32530, 308, Petro-Hunt, USA 153-95-4B-9-7H, Charlson, t1/19; cum 192K 9/19;
  • 32529, 1,201, Petro-Hunt, USA 153-95-4B-9-8H, Charlson, t1/19; cum 191K 9/19;
  • 33905, 1,219, Petro-Hunt, USA 153-95-4B-9A-1HS, Charlson, t10/18; cum 181K 9/19;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN6-20197326431131244436804368
BAKKEN5-2019301464814810578019499019374
BAKKEN4-2019301742017381620822927022718
BAKKEN3-2019312033620180709830082029866
BAKKEN2-2019281904219075646129312029137
BAKKEN1-2019312920629189848842501042285
BAKKEN12-2018313083930973750344394044179
BAKKEN11-20181872710100
BAKKEN10-20181112080114721805749307416

Original Post
 
Petro-Hunt Charlson USA wells in 154-94-13 are tracked here.

The Petro-Hunt Charlson USA wells at this post are in 153-95-4.

The Petro-Hunt Charlson USA wells are always interesting. Take a look at this one:
  • 27208, 2,262, Petro-Hunt USA 153-95-4B-8-2HS, t12/14; cum 630K 9/19; producing 5,000 bbls/month (6/19); not on a pump as of 5/18; now on a pump (noted 6/19);
Now look at the production profile, look at the jump in production, 9/17; it was off-line for less than a month. A well from the south (#30685, USA 153-95-9C-4-3H, was tested 8/17 which corresponds with the jump in production below).
Monthly Production Data:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-201831970294933503234762316892
BAKKEN4-2018309603978940732310222075818
BAKKEN3-2018311113711215357825090248740
BAKKEN2-201828108151076036322271721980542
BAKKEN1-2018311208112092394723406231900
BAKKEN12-2017311280212759346722487222710
BAKKEN11-20173013347133333473244881047513804
BAKKEN10-2017311560415618314327292027076
BAKKEN9-2017301461314131255223480023299
BAKKEN8-20173554914117211020890
BAKKEN7-20173157405789125220515202990
BAKKEN6-2017306092612913722043619751476
BAKKEN5-20173159265669135019643686312564
BAKKEN4-20173091929240141520129199200

The graphic:



Other wells in that graphic:
  • 27208, 2,262, Petro-Hunt, USA 153-95-4B-8-2HS, Charlson, t12/14; cum 630K 9/19; huge jump in 9/17;
  • 27918, 1,167, Petro-Hunt, USA 153-95-4B-8-1HS, Charlson, t12/14; cum 338K 9/19; huge jump in 9/17;
  • 20342, 1,430, Petro-Hunt, USA 153-95-4B-8-1H, Charlson, t11/11; cum 1.026493 million bbls 919; huge jump in 9/17; closing in on one million bbls cumulative (858,278 bo + 1,283,115 MCF = 858,278 + 213,817 boe = 1.07 million boe in less than seven years; Bakken wells will produce for 30+ years

  • 30685, from the south, running north, 1,380, Petro-Hunt, USA 153-95-9C-4-3H, Charlson, t8/17; cum 281K 9/19; huge jump in 9/17; off line 6/19; returns to production, 9/19;

  • 11983, 60/220 (Bakken/Silurian); from the Bakken only (Silurian is now PNA), Petro-Hunt, USA 5D-4-4HR, Charlson, t5/08; cum 212K 9/19;

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.