Pages

Thursday, October 19, 2017

Something Analysts Aren't Talking About Much: Re-Fracks -- October 19, 2017

See this post regarding CLR's Rattlesnake Point wells

From an earlier post:
From a May 31, 2016, sundry report, for:
  • 17089, 400, CLR, Bridger 44-14H, Rattlesnake Point, open hole frack with 1 million lbs sand, t4/08; cum 134K 4/16;
CLR plans to re-enter and deepen the existing lateral of the Bridger 44-14H. CLR plans to extend the existing lateral by 336' to a TVD of 11,090' and a MD of 21,194' to the proposed BHL (200' FNL, 1320' FEL). After drilling to the proposed BHL, CLR plans to set a liner top packer in the 7" casing at 10,634' MD and then cement the 4.5" 11.6 ppf production liner in place.

CLR will not be injecting diesel fuel during our hydraulic stimulation activities.
So, how did the re-frack go? From FracFocus, re-fracked: 4/28/17 - 5/19/17 --
  • 17089, conf, CLR, Bridger 44-14H, Rattlesnake Point, 
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN8-20173127510274882742728501217386763
BAKKEN7-20175210220478371178851093
BAKKEN6-2017151923013063170317
BAKKEN5-20170000000
BAKKEN4-20170000000
BAKKEN3-20170000000
BAKKEN2-20170000000
BAKKEN1-20170000000
BAKKEN12-20160000000
BAKKEN11-20160000000
BAKKEN10-20160000000
BAKKEN9-20160000000
BAKKEN8-20160000000
BAKKEN7-201663356448743366367
BAKKEN6-2016302106222060225321592373

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.