Pages

Friday, May 26, 2017

Faulty Weld Behind Dakota Access (DAPL) Leak -- May 26, 2017

Link here to The Williston Herald. Archived.

Incredibly poor reporting and worse, a fake headline. From a reader:
DAPL leak not a weld but a flange on a line connected to DAPL and a valve at a pump station....not equipment tested during the hydro where the line is pressured above it's maximum allowable operating pressure ....water test before crude introduced.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.