Pages

Tuesday, April 26, 2016

More On The Skarston Wells, Banks Oil Field -- April 26, 2016

NOTE: don't update this page. The Skarston wells are now tracked / updated here.

Updates


July 15, 2016
Monthly Production Data

Update on eight Skarston wells on an 8-well pad.

Note that two of them are listed as "INACTIVE" and several have been off-line much of this time. According to the NDIC May, 2016, production data, the following Skarston wells were "SI": 21664, 25859, and 25856. The well drilled in 2012 (#21664) is now classified as "AB" according to the file report. "Batch-drilled,"  spud date, TD date; test date:.
  • 25854, 3,098, Skarston 1-12 2TFH: 9/21/14; 11/12/14; t4/16; cum 341K 3/19; see full production profile here;
  • 25856, 3,645, Skarston 1-12 7H: 9/19/14; 12/01/14; t3/16; cum 224K 3/19; -- went inactive after 7 days 4/16; inactive through 5/16; back on status for full month 8/16; sporadic production lately suggesting activity, 3/19;
  • 25857, 4,545, Skarston 1 -12 4H, 41 stages; 6 million lbs: 9/17/14; 12/08/14; t4/16; cum 380K 3/19; sporadic production lately suggesting activity, 3/19;
  • 25858, 5,010, Skarston 1-12 5H: s9/14/14; 2/14/15; t3/16; cum 433K 3/19; off-line all of 4/16 and back on-line for last 20 days in 5/16; on-line since then; 41 stages; 9.2 million lbs;
    sporadic production lately suggesting activity, 3/19;
  • 25859, 3,802, Skarston 1-12 6TFH: 9/14/14; 2/25/15; t3/16; cum 240K 3/19; production report shows the well was not on line all of 4/16 and 5/16; produced 9,455 bbls over 31 days in 3/16; back on status since 6/16; sporadic production lately suggesting activity, 3/19;
  • 25855, 3,115, Skarston 1-12 3TFH: 9/10/14; 3/11/15; t4/16; cum 215K 3/19; off-line all of 5/16; back on status as of 7/16; sporadic production lately suggesting activity, 3/19;
  • 29563, 4,278, Skarston 1-12 8TFH: 1/07/15; 2/5/15; stimulated 10/15; 40 stages, 6 million lbs; t3/16; cum 166K 3/19; on-line only 7 days in 4/16; off-line all of 5/16; back on status as of 8/16; sporadic production lately suggesting activity, 3/19;
  • 29564, 3,583, Skarston XE 1H: 11/11/14; 4/14/15; t3/16; cum 356K 3/19; on-line only 6 days in 3/16; 7 days in 4/16; and only 19 days in 5/16; back on status as of 5/16; sporadic production lately suggesting activity, 3/19;
  • 21664, 3,235, Equinor, Skarston 1-12 1H, Banks, t9/12; cum 329K 3/19; sporadic production lately suggesting activity, 3/19;
Record IP? see FAQ #9 at this post

According to a sundry form dated February 16, 2016: Statoil reqeusted a waiver to NDAC Sec 43-02-03-55 and seeks time to meet compliance. The wells listed below (the same wells above) were batch drilled on a multi-well pad. Statoil requests an extension to be granted for all wells on the pad based on the last day total depth was reached for the last well on the pad [4/14/15, TD date for #29564]. The Skarston 1-12XE #1H was the last well batch drilled on the multi-well pad for the previously listed 8 wells. In addition, production from the existing Skarson 1-12 1H (#21664) ceased to accommodate drilling operations. A letter dated 1/25/2016 from Rick Dunn (NDIC) requires production be restored or the well be plugged and abandoned. Statoil requests that the extention be granted for all nine wells until 4/14/2016 to be bring the wells into production.

*********************************

This has to do with the Skarston well that was reported yesterday, a DUC:
  • 25858, 5,010, Statoil, Skarston 1-12 5H, Banks, a middle Bakken well, t3/16; cum see above.
With another Skarston well on this pad, there was evidence of communication with another well from a pad in a neighboring section. Link here: http://themilliondollarway.blogspot.com/2015/11/evidence-of-communication-between-wells.html.

Other pertinent links:
I used to track the Skarston wells elsewhere, but will move the tracking to this post.

******************************
Statoil's Skarston Wells
Banks Oil Field

Originally posted April 22, 2016.

Eight wells on an 8-well pad, "batch-drilled," spud date, TD date; test date:
  • 25854, 3,098, Skarston 1-12 2TFH: 9/21/14; 11/12/14; t4/16; cum 8K over first 12 days;
  • 25856, 3,645, Skarston 1-12 7H: 9/19/14; 12/01/14; t3/16; cum --
  • 25857, 4,545, Skarston 1 -12 4H: 9/17/14; 12/08/14; t4/16; cum --
  • 25858, 5,010, Skarston 1-12 5H: 9/14/14; 2/14/15; t3/16; cum --
  • 25859, 3,802, Skarston 1-12 6TFH: 9/14/14; 2/25/15; t3/16; cum --
  • 25855, 3,115, Skarston 1-12 3TFH: 9/10/14; 3/11/15; t4/16; cum --
  • 29563, 4,278, Skarston 1-12 8TFH: 1/07/15; 2/5/15; t3/16; cum --
  • 29564, 3,583, Skarston XE 1H: 11/11/14; 4/14/15; t3/16; cum --
So, between 11/12/14 and 4/14/15: 8 wells on an 8-well pad drilled to depth. I assume they can be fracked within a couple of weeks, and oil in the national pipeline system within 30 days.

As of April, 2016: all on SI/NC status.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.