Pages

Wednesday, October 28, 2015

Random Update Of A BR Hammerhead Well In Sand Creek -- October 28, 2015

Updates

May 25, 2017: production profile is erratic, but nothing of note to report. 

Original Post

Random update of this well:
  • 28779, 1,443, BR, Hammerhead 11-26TFH, Sand Creek, a Weatherford operation, 1280-acre spacing, Three Forks B1, very low gas units, 35 stages, 7.3 million lbs, t6/15; cum 125K 5/17;
Production profile:

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-20173145214484543497199397245
BAKKEN4-201724558653585724101279457639
BAKKEN3-20170030000
BAKKEN2-2017266269691581530
BAKKEN1-201731424741385387492328252021
BAKKEN12-201619219822102650115511080
BAKKEN11-201630268426673649382737530
BAKKEN10-201631274327444185430542280
BAKKEN9-201630269226254080360935350
BAKKEN8-2016877782311806606400
BAKKEN7-201630262926443644485247780
BAKKEN6-201630350734916317528552110
BAKKEN5-2016312196219540242589242290
BAKKEN4-20162025772651508713523134730
BAKKEN3-20163174127420911840261401840
BAKKEN2-20162987688752894836108360360
BAKKEN1-2016311223212204144623668336482124
BAKKEN12-2015311259612579127623180731520211
BAKKEN11-20152598919884734126628265660
BAKKEN10-20153114219142191395937714376370
BAKKEN9-20153089738890843023018229440
BAKKEN8-2015368683662822750
BAKKEN7-20150000000
BAKKEN6-201514144971449715267374192072616658
BAKKEN5-20150000000
BAKKEN4-20150000000

This is not particularly out of the norm for BR wells early on in this area of the Bakken (Sand Creek) but it is interesting enough to follow. The file report noted that "a last minute change in the proposed completion optimization, the 4 1/2" 13.5# liner which we ran to 20915' MD was cemented in place with 590 sxs Class G cmt. This would modify the proposed stimulation to a plug and perf with 35 stages."

Because of limited time, I'm only going to post this much and then come back to this one later if I remember.

But note the production profile.

Note the amount of proppant: over 7 million lbs with fairly typical number of stages for Bakken wells in 2015.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.