- $65 million facility
- multiple use: sand, pipe, oil
- designed to bring trucks in / out on west side of Beach
- near the Carlyle, MT, exit -- 1.3 miles to the west of the proposed facility property line
- would be built in phases; first phase, commodities, by fall 2015
- 23 trains pass through the town daily (now); increased traffic by one train daily
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.