Pages

Tuesday, December 11, 2012

First-Ever LNG-Fueled Hydraulic Fracturing Operation in North America: Eagle Ford, Ferus' LNG Division

Updates

January 20, 2013: the first post on this subject

Original Post
Link to Rigzone.com
The liquefied natural gas (LNG) division of Calgary-based Ferus LP successfully completed in October what the company believes to be the first-ever hydraulic fracturing operation utilizing liquefied natural gas (LNG) as engine fuel in North America.
Ferus' LNG Division was engaged by a major oil and gas service company in the United States to conduct the pilot project, which involved six dual-fuel 2,250 horsepower pressure pumper units, powered by LNG, to stimulate well performance in the south Texas Eagle Ford shale.
The dual fuel systems allow for natural gas and diesel to be consumed simultaneously with no decrease in performance, Jed Tallman, manager of market development for Ferus LNG, told Rigzone. Approximately 10,000 gallons of LNG was used in the pilot project, which took place in the southwestern portion of the Eagle Ford play.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.