Pages

Friday, May 18, 2012

Enbridge Announces Additional Expansion Going East From the Bakken, Alberta

 Link here.

I'm starting to lose the bubble(s) on all of the pipeline projects. At the linked story, there are a number of Enbridge projects.

Some data points from the article:
Lakehead System (Enbridge): increasing capacity on:
  • Alberta Clipper pipeline (Line 67), into Superior, WI; from 450K bopd to 570 bopd
  • Southern Access pipeline (Line 61) from Superior, WI, to Flanagan, near Pontiac, ILL; from 400K bopd to 560K bop
  • only additional pumping power needed; no new pipeline construction
  • in service by mid-2014; $360 million
Eastern Access projects: increasing capacity on:
  • Spearhead North pipeline (Line 62) between Flanagan and Griffith, IN; from 130K bopd to 235 bopd
  • will also add a 330K bbl tank at Griffith to existing storage
  • will replace additional sections of ENB Line 6B previously announced which will increase capacity from  240K bopd to 500K bopd
  • Line 6B expansions and previously announced Line 5 50K bopd expansion by 2014; $2.2 billion
Mainline pipeline
  • construct a 35-mile pipeline adjacent to ENB Toledo Pipeline (Line 17), originating at Line 6B in Michigan and serving refineries in MI and OH
  • a reversal of Line 9B from Westover, Ontario, to Montreal
  • more power, not more pipeline

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.