From yesterday, new permits:
  • BR has permits for two Faye wells in NENE 14-151-97, Elidah oil field; both 290 FNL, about 650 FEL
  • BR also has a permit for a Don Juan well in NENE 14-151-97, Dimmick Lake; 290 FNL 581 FEL;
The "Faye" pad:
  • 33861, 226, BR, Faye 1A MBH, Elidah, t7/18; cum 307K 2/20;
  • 33860, 475, BR, Faye 1B UTFH, Elidah, t7/18; cum 187K 2/20;
  • 33859, 669, BR, Faye 1C MBH, Elidah, t7/18; cum 285K 2/20;
  • 33858, 733, BR, Faye 1D UTFH, Elidah, t7/18; cum 233K 2/20;
From the south, running north, and horizontal parallel to the "Faye" horizontals. The Faye wells were
  • 19715,1,068, CLR, Don 1-23H, Elidah, t6/11; cum 314K 2/29;
Production period of interest, the Faye pads noted above were fracked in 6/18::
BAKKEN1-201931371239482120681636112788
BAKKEN12-2018314942492328681368712273995
BAKKEN11-20183059225583319743693422552
BAKKEN10-201831750776614027158231533470
BAKKEN9-20183083158517498318325158462100
BAKKEN8-20182137523445495865805568770
BAKKEN7-20182358165758638110501102060
BAKKEN6-20182774077491993311964116500
BAKKEN5-20180000000
BAKKEN4-2018281125118049024842274210
BAKKEN3-20183112031401533271427140
BAKKEN2-2018281191938383288728870
BAKKEN1-20183112811427433286028600

The graphic: