Thursday, December 29, 2016

Nine (9) New Permits -- December 29, 2016

Active rigs:


12/29/201612/29/201512/29/201412/29/201312/29/2012
Active Rigs3960172187187

Wells coming off confidential list Friday:
  • 31332, 235 (no typo), Oasis, Johnsrud 5198 12-18 9B, Siverston, 36 stages, 4 million lbs, t6/16; cum 122K 10/16;
  • 31892, 1,717, Hess, BB-Sivertson-151-95-2019H-6, Blue Buttes, 53 stages, 3.7 million lbs, t11/16; cum --
  • 32629, 219, SM Energy, Selle 4B-4HN, West Ambrose, t9/16; cum 8K 10/16;
Nine (9) new permits:
  • Operators: Hess (5), Oasis (4)
  • Fields: Antelope (McKenzie), Banks (McKenzie)
  • Comments:
One producing well (DUC) completed:
30430, 1,438, Statoil, Jack 21-16 8TFH, East Fork, t11/16; cum -- ; the file report has an excellent map of the area with surface owners; information regarding microseismic survey; very, very interesting

*************************************

31332, see above, Oasis, Johnsrud 5198 12-18 9B, Siverston:

DateOil RunsMCF Sold
10-20163203461837
9-20163220444747
8-20162774841866
7-20162963844731
6-2016821128

****************************************
The AN-Dinwoodie Wells

Note: the AN-Dinwoodie wells will no longer be tracked here. They will be tracked elsewhere.
Proposed location for a 5-well Hess AN-Dinwoodie pad:



*************************************
The AN-Dinwoodie Wells

Note: the AN-Dinwoodie wells will no longer be tracked here. They will be tracked elsewhere.

The first one:
  • 19887, 714, Hess, AN-Dinwoodie-153-94-2833H1, Antelope, Sanish pool, t7/11; cum 208K 10/16; from the file report, the geologist's notes: the Antelope field covers more than 76 square miles and produces from seven pools: Devonian, Madison, Red River, Sanish, Silurian, Stonewall, and Winnipeg/Deadwood. Sanish pool cumulative production totals from December 1953 through January 2011 is: 13,628,037 BO; 1,324,964 BW; and, 13,049,445 MCFG. Peak oil production occurred in 1966 with a maximum of 34 wells producing from the Sanish Pool during 1967 and 1968. Seventeen wells are currently producing from the Sanish pool in Antelope field.
The Devonian Three Forks formation and target zone: 11,262' MD (10,866' TVD). The top of the ideal preferred target zone is approximately 16' TST beneath the top of the Three Forks formation.

The target zone ... informally named "D" and "E" intervals...the lateral was drilled 100% within the upper portion of the Three Forks formation, with greater than 70% of the well bore to be completed within the ideal preferred target porosity. Drilled from re-entry to TD in 23.7 days; drilling along the the lateral was efficiently executed in two runs.
Then:
  • 33238, conf, Hess, AN-Dinwoodie-153-94-2833H-8, Antelope, no production data,
  • 33237, conf, Hess, AN-Dinwoodie-153-94-2833H-7, Antelope, no production data,
  • 33236, rigon site (10/18), Hess, AN-Dinwoodie-153-94-2833H-6, Antelope, no production data,
  • 33235, conf, Hess, AN-Dinwoodie-153-94-2833H-5, Antelope, no production data,
  • 33234, conf, Hess, AN-Dinwoodie-153-94-2833H-4, Antelope, no production data,
  • 32860, 2,708, Hess, AN-Dinwoodie-153-94-2833H-2, Antelope-Sanish, t10/17; cum 157K 10/18;
  • 32861, 2,202, Hess, AN-Dinwoodie-153-94-2833H-3, Antelope-Sanish, t10/17; cum 196K 10/18;
  • 32862, 1,952, Hess, AN-Dinwoodie-LE-153-94-2833H-8, Antelope-Sanish, t10/17; cum 200K 10/18;
  • 19887, 714, Hess, AN-Dinwoodie-153-94-2833H-1, Antelope-Sanish, t7/11; cum 247K 10/18; no bump in production;

No comments:

Post a Comment