Friday, November 11, 2011

Five (5) New Permits -- Bakken, North Dakota, USA; November 10, 2011

Daily activity report, November 10, 2011 --
  • Operators: BEXP (2), Petro-Hunt (2), BR
  • Fields: Squires, Sugar Beet, Cartwright, Rough Rider
Petro-Hunt has a wildcat in Williams.

One of two wells released from "tight hole" status was completed/fracked (50% backlog in fracking)
  • 20040, 883, XTO, William 41X-6, McKenzie, Bakken, t9/11; cum 206K 4/17;
Two other previously producing wells were completed and reported, including a nice Marathon well:
  • 17942, 1,184, MRO, Kovaloff 14-9H, Dunn, Bakken, t10/11; cum 193K4/17;
And, of interest, Sequel re-completes a well from Red River to Birdbear and Duperow, is how it is recorded in the daily activity report. I'll be learning with this one. This appears to have been a Duperow/Birdbear well when it was spudded in 1988; then the Red River was added in June, 2011, and the Duperow/Birdbear were abandoned.
  • 12240, recomplete, Sequel, Hay Draw 33-33, McKenzie; it looks like this was not a success; the IP in 2011 was 30 from the Red River; and there has been no production since, as of 6/12; update, 8/14 -- about 70 bbls every three months;

No comments:

Post a Comment